• 中文
  • English

Huangpu Wenchong Project No.1 Ship Crane Successfully Shipped

Time: 2017-10-25 08:00:00

Author: TTS-SCM MARINE AND OFFSHORE MACHINERY CO.,LTD.

Click:

On October 12th, the sunshine was bright and the breeze brought warmth. This morning, the No.1 ship crane for the Huangpu Wenchong 150T project slowly left the Huaji wharf and was successfully sent to the shipyard.


Huangpu Wenchong Project No.1 Ship Crane Successfully Shipped
On October 25th, the sunshine was bright and the breeze brought warmth. This morning, the No.1 ship crane for the Huangpu Wenchong 150T project slowly left the Huaji wharf and was successfully sent to the shipyard.
Long by picture save/share
0

COPYRIGHT: TTS-SCM MARINE AND OFFSHORE MACHINERY CO.,LTD.

TTS-SCM MARINE AND OFFSHORE MACHINERY CO.,LTD.

Address :5th Floor, South China Shipbuilding Factory Office Building, Zhongchuan Longxue Shipbuilding Base, Nansha District, Guangzhou City, Guangdong Province, China

Email:business@tts-scm.com

Postal code:511462

Telephone    

+86 20 39080686

 

Copyright: TTS-SCM MARINE AND OFFSHORE MACHINERY CO.,LTD.  Powered by: WZTX LOGIN

Add WeChat friend to learn more about the product
Use Enterprise WeChat
"Scan" to join the group chat
Copy success!
Add WeChat friend to learn more about the product
I see.